CI-OS (Second-Brain)
tracker.md
CI-OS Completion Tracker
Last verified: 2026-07-14
Overall product completion: 35 percent
Engineering scaffold completion: 65 percent
Launch status: Not ready
Phase Status
| Phase | Outcome | Status |
|---|---|---|
| 0. Contain and baseline | Clean, reviewable, versioned implementation | Passed |
| 1. Restore Hermes execution | Healthy scheduled operating loop | Passed |
| 2. Trustworthy publication | Atomic, fresh, run-bound release evidence | Active |
| 3. Product Muscle | Current Scout-backed product comparison | Pending |
| 4. Audience Demand | Valid GA4 / Looker evidence plane | Pending external data source |
| 5. Argus Intelligence | Accepted cross-plane pattern, action, and learning | Pending |
| 6. Product IA | Coherent Argus business workflows | Pending |
| 7. End-to-end validation | Backend, frontend, semantic, UX, accessibility, and security proof | Pending |
| 8. Algolia pilot | Versioned, monitored, controlled release | Pending |
Completed Foundations
- Hermes extension and Argus operating model.
- Multi-tenant data model.
- Competitor, source, and product-surface registry scaffolding.
- Evidence and intelligence object model.
- Collection, product, demand, pattern, recommendation, and learning primitives.
- Local administration scaffolding.
- Public dashboard and competitor-specific brief scaffolding.
- Broad local automated test suite.
- Forensic status review and gated completion plan.
- Two consecutive real Hermes runs as
cios, both exit 0, with clean containment and ownership. - Immutable deployed package
1fa7ac5and verified rollback bundle.
Current Gate
The project is currently limited to Phase 2 publication integrity:
- Bind all stages and public artifacts to one run ID.
- Stage and validate the complete artifact set before atomic publication.
- Write final public status last.
- Reject stale, mismatched, spoofed, self-attested, partial, and path-leaking evidence.
- Pass one fresh, complete, safe Hermes run.
Phase 1 evidence is recorded in
docs/status/2026-07-14-ci-os-phase1-hermes-execution-gate.md.
Next Gate
CI-OS must bind every public artifact to one fresh run and prove publication safety before Product Muscle, Audience Demand, intelligence, or interface expansion resumes.